Eurosafe
BMU System - The Fold

Monorail Systems

The increasing demand for space within densely populated cities has transformed rooftops into public terraces and landscaped green areas. As a result, installing traditional roof-mounted Building Maintenance Unit (BMU) is often no longer feasible. This has driven a significant rise in the use of façade-mounted monorail systems on modern buildings.

Eurosafe specialises in the installation of NorAcon monorail systems, offering a comprehensive range of profiles designed to accommodate varying fixing substrates and support bracket spacings. Combined with a selection of manual and powered trolleys, the NorAcon range provides the flexibility to design systems suitable for suspended cradles or rope access operations.

Each monorail system is engineered to adapt seamlessly to its environment - whether integrated through a glazed façade, fixed beneath a soffit, or installed within an atrium. Systems can be supplied anodised or powder coated in any RAL colour and may be curved, bent, or twisted to suit even the most architecturally complex structures while maintaining a clean, unobtrusive appearance.

Eurosafe’s in-house design and fabrication capabilities also enable the manufacture of bespoke support brackets, allowing systems to be securely fixed to a wide variety of structural substrates, regardless of complexity.

Monorail System
Noracon NP01
Noracon Monorail System
Noracon Monorail System
Noracon Monorail System
 

Norlift Climbing Trolley

By incorporating the NL01E Norlift Climbing Trolley, Eurosafe can design systems capable of traversing inclined or vertical sections of NP01 monorail, even in challenging wet or windy conditions.

Once installed, the rail system can be paired with a wide range of access solutions, including standard or bespoke one and two-person cradle systems. Alternatively, we can provide trolleys and associated equipment for rope access applications.

Following installation, Eurosafe delivers comprehensive user training, detailed end-user documentation, warranties, and long-term maintenance contract - ensuring the system continues to operate safely and reliably throughout its lifecycle.

Related Case Study

View all Case Studies

For more information about Monorail Systems please contact...

Daniel Capper

Pre-Construction Director, Contracting

We are trusted by

Keep in touch with us

Feel like giving us a call?

We're available 8.00 - 16.30 Monday - Thursday, and 8.00 - 14.00 on Friday
0114 250 7411

Alternatively, you can email us

We strive to respond within 1 business day. Don't hesitate to reach out!
info@eurosafeuk.com

Stay connected by following us

Keep up to date with our news, latest projects, and industry insights
Follow us on LinkedIn

Subscribe to our newsletter and stay updated

Sign up for our monthly newsletter and stay informed about the latest news and blogs.
Captcha is loading...